Roof Replacement in the Rio Grande Valley, TX

Tear-off day is the day your house sits open. The crew strips only what it can dry in before dark, since June gust fronts build fast.

A full roof replacement goes down to the decking, replaces the bad wood and dries the house in. A typical 1,800 square foot home in the Valley measures about 22 squares and takes 2 to 3 working days. Every sheet of decking we replace is photographed.

What the job includes02

What a roofing job with us includes

Tear-off day is the day your house is open, and that matters here. A clear June afternoon can build a 40 mile per hour gust front in under an hour. So the crew strips only what it can dry in before dark. Deck surfaces in the Valley also pass 160 degrees. Underlayment that wrinkles and tears is a real risk, not a detail.

Front porch with cedar posts on a blue ranch home with white stone
Blue board and batten ranch homeCuates Construction
  • Tear-off of every layer down to the bare decking
  • Decking sheets replaced wherever the wood is soft, split or delaminated
  • Synthetic underlayment over the whole deck, sealed membrane in the valleys
  • Six nails per shingle on the field and a sealed starter course at every edge
  • New drip edge, step flashing, counter flashing and pipe boots
  • Attic intake and exhaust balanced so the new roof can breathe
  • Plywood over the AC condenser, the pool pump and anything planted close
  • Dumpster set on boards so your driveway does not crack under the load
Signs you need this work
  • Granules filling the gutter troughs and piling under every downspout
  • Tabs curling at the corners across a whole slope, not in one patch
  • Daylight visible through the deck when you stand in the attic at noon
  • Two or three separate leaks showing up in the same rainy week
  • A roof past 20 years that has already been patched more than twice
  • Nail heads backing out and lifting the shingle above them in straight lines
Remodels designed around your houseA background building custom homesEnglish and SpanishBased in Rio Grande City, serving the whole ValleyFree estimate within 48 hours

Price range03

How much does roofing cost in the Rio Grande Valley?

How long it takes

2 to 3 working days on a 22 square single-story home

One day on a small simple roof. Six to seven days when most of the decking has to change.

Which material holds up best in Valley weather?

Materials compared for the Rio Grande Valley climate
MaterialHolds up becauseWatch out forBest forLasts
Synthetic underlaymentStays flat and does not tear when the deck sits open in 100 degree heatCosts more per roll than felt, so a cheap bid usually skips itEvery replacement we do, inland and on the coastRated for about 6 months of sun exposure before the roof goes on
Number 30 feltCheapest way to dry in a deck and every supply house on US-83 stocks itBuckles in Valley heat and tears under a boot within daysSheds and detached garages that go back together the same dayAbout 30 days of exposure, not a season
Self sealing membraneSeals around every nail, which is what valleys and low slopes needNeeds a ventilation plan before it goes over a whole deckValleys, eaves, chimney sides and any slope under 4:12Lasts as long as the roof above it
CDX decking, 15/32 inchHolds a nail after decades of heat cycling, unlike old thin sheathingHas to be ordered by the unit when a whole roof is bad, which adds a dayReplacing soft sheets over living space and over the garage30 years or more as long as it stays dry

How we work this job04

How does the job actually run?

A written estimate before anything starts, a start date we commit to, and one person responsible from the first walkthrough to the last inspection.

  1. Square count and deck checkDavid measures every plane, counts the squares and opens your attic to look for daylight, wet insulation and stained rafters.Visit 1
  2. You pick the profile in sunlightYou see full boards outside, never a phone screen. Valley sun reads color differently than a showroom light does.Before ordering
  3. Material lands and the yard gets coveredBundles go up on the roof and the dumpster goes on boards. The AC unit, the pool pump and close planting get covered.Day before
  4. Tear-off and dry-in, same dayOnly as much roof comes off as the crew can cover before dark. No section of your house is left open under a night sky.Day 1 of work
  5. Final walk with the decking countYou get the number of sheets replaced and a photo of each one. The magnet sweep and the written warranty close the job.Handover

From the build site05

Which homes has David Aceves helped build?

Homes built by Cuates Construction, with David Aceves on the build. Look at the roof lines, the eaves and where the roof meets the walls: David plans a roofing job with that same eye.

Stone and stucco home with a shingle hip roof, a three-car garage and a stamped concrete driveway
Two-story stone and stucco homeCuates Construction
Blue board and batten ranch home with white stone, cedar trim and a gray shingle roof
Blue board and batten ranch homeCuates Construction
Gray stucco home with stone-look panels, a concrete driveway and wall sconces
Contemporary gray stucco homeCuates Construction
The four homes, room by room

Questions we get06

Questions homeowners ask us about this work

Can you put a new roof over the old shingles?

It is legal in most of the Valley and we still advise against it. A second layer traps heat against the deck and hides soft wood you never see. Most manufacturers also cut the material warranty. The savings on tear-off come back as a shorter roof life.

What happens if it rains in the middle of my replacement?

Nothing gets left open. The crew strips only what it can dry in the same day. By late afternoon every exposed plane sits under underlayment. If a cell moves in early, work stops and the open area gets covered. We come back the next clear day.

Will the hammering crack my ceilings?

Hairline cracks in old drywall tape are possible, mostly in homes built before 1990. Take pictures, mirrors and anything on a nail off the walls the night before, and clear the top shelves. We photograph the interior before we start so there is no argument later.

How do I know how many squares my house is?

One square is 100 square feet of roof, not of floor. A 1,800 square foot single-story home with a 5:12 pitch measures near 22 squares. Overhangs and pitch add to the count. A two-story home has a smaller footprint but usually a steeper roof.

Do I have to be home while the crew works?

No. We need gate access, a working exterior outlet and somewhere to park the dumpster. Most owners leave for work and come back to a finished roof. If you do stay, plan for noise from early morning until mid afternoon.

What happens to my satellite dish and solar panels?

A dish comes off and goes back on the same mount, and you may need to re-aim it yourself. Solar panels are different: your solar company removes and resets them, and we schedule the tear-off around their two visits.

Written byThe Aceves Home Remodeling team

A remodeling contractor based in Rio Grande City, working across the four Valley counties. The team is led by David Aceves, whose background is building custom homes, from the slab and the framing to the finish work.

Last reviewed: · More about Aceves Home Remodeling

Let us talk07

Tell us about your roofing project.

(346) 779-2314
Get a Free EstimateSee Our Work
ResponseWritten estimate within 48 hours
LanguagesEnglish and Spanish
Based inRio Grande City, TX
HoursBy appointment
Free estimate4 fields

Tell us what needs work

Written estimate within 48 hours
CallFree Estimate