Exterior Remodeling in the Rio Grande Valley, TX
We open one wall of your house at a time and close it the same day. Stucco goes on in three coats over metal lath, 7/8 inch thick.
You can replace siding, windows, doors and stucco anywhere in the four county Rio Grande Valley. A whole house window swap usually takes 2 to 4 days of work. Near the coast we verify the windstorm inspection requirement by your address before we put a price in writing.
What the job includes02
What a exterior remodeling job with us includes
A Valley exterior takes sun on three sides for most of the year. Summer roof surface temperatures pass 160 degrees, and the same sun fades west walls first. Hail and straight line wind hit siding and glass between March and May. Hurricane season runs June through November. From Rio Hondo east to South Padre Island, salt air pits aluminum trim and eats plain steel nails. On the coast, fastener choice matters as much as the siding you pick.

- —Old siding pulled off and the sheathing behind it checked for rot and termite damage
- —House wrap lapped over flashing at every window head, sill and corner
- —Fiber cement or vinyl siding fastened into studs at 16 inches on center
- —Window openings squared and shimmed, then sealed with low expansion foam
- —Three coat stucco over metal lath, 7/8 inch thick, cured before the finish coat
- —Weep screed kept at least 4 inches above the dirt so water drains out of the wall
- —Exterior doors hung on a new sill pan with an adjustable threshold
- —Two coats of exterior acrylic over patched, primed and re-caulked surfaces
Price range03
How much does exterior remodeling cost in the Rio Grande Valley?
2 to 4 days for a whole house window replacement on a single story home
One day for a single door. Three to four weeks for siding, stucco and paint on the whole exterior.
Which material holds up best in Valley weather?
| Material | Holds up because | Watch out for | Best for | Lasts |
|---|---|---|---|---|
| Fiber cement siding | Termites do not eat it, and it holds paint better than wood in this sun | Heavy, slow to cut, and the dust has to be controlled on site | Inland homes in Starr and Hidalgo counties | 30 to 50 years, repainted every 10 to 15 |
| Vinyl siding | Lowest installed cost, and it never needs paint | Dark colors can warp on a west wall in July | Rental houses and budgets set before the job starts | 20 to 30 years |
| Three coat stucco | Matches most Valley houses and takes the heat without moving | Every foundation movement shows up as a crack you can see | Homes already finished in stucco or masonry | 50 years or more when the cracks get sealed |
| Painted brick or block | Nothing new goes on the wall, so the cost is prep and paint | Once painted, the brick has to be repainted on a cycle | Homes whose brick stopped matching after an addition | 7 to 10 years per paint cycle |
How we work this job04
How does the job actually run?
A written estimate before anything starts, a start date we commit to, and one person responsible from the first walkthrough to the last inspection.
- 01We walk every wall of the houseDavid measures each elevation, opens a corner of trim and counts window openings by size. The visit takes about 60 minutes.Day 1
- 02You get a line item scope in writingWall square footage, window sizes, stucco repair area and the paint product, each priced on its own line.Within 48 hours
- 03Windows and doors are ordered before anything opens upSpecial order units run 3 to 6 weeks from the supplier. Nobody cuts into a wall while the order is still in transit.Weeks 1 to 6
- 04One wall at a time comes off and goes back onEach elevation is opened, flashed, dried in and closed the same day. Your house is never left open overnight.Build
- 05Caulk, two coats of paint and a walk around with youFailed caulk gets cut out instead of painted over. We walk all four elevations with you before the last payment.Handover
From the build site05
Which homes has David Aceves helped build?
Homes built by Cuates Construction, with David Aceves on the build. Look at the stone, the stucco, the siding and the trim: David plans a exterior remodeling job with that same eye.
Questions we get06
Questions homeowners ask us about this work
Should I re-side the house or repair the stucco that is already there?
Pull a corner of trim and look at the sheathing behind it. Sound sheathing with cracked stucco is a repair job, not a tear off. We patch, re-lath the failed sections and paint, which takes about a week on a single story house.
How long does a whole house window replacement take?
Two to four days of install on a single story home with 10 to 14 openings. The wait is upstream: special order units run 3 to 6 weeks from the supplier. We do not open a wall until the boxes are on site and counted.
Do impact rated windows lower what I pay for insurance on the coast?
Some carriers give a credit for impact rated glazing, and some do not. That decision belongs to your insurer, so we never promise a number. We give you the product data sheet and the installation paperwork for your agent.
What does a windstorm inspection have to do with new windows and doors?
Coastal Cameron and Willacy addresses sit in the state designated catastrophe area for windstorm coverage. Whether your specific address needs an inspection gets verified by address, not by county line. We check that before the order goes in, because the paperwork has to follow the product.
Why does the stucco crack in the same place every year?
A crack that returns follows movement, not bad mixing. Slab edges, window corners and the joint where an addition meets the original house all move on their own schedule. We cut that crack out, install a control joint or a lath patch, then coat it with elastomeric paint.
When is it too hot to paint a house in the Valley?
Most exterior acrylics list a working range of 50 to 90 degrees on the surface, not in the air. A west wall passes that by late morning in July. So we paint east and north walls early, chase the shade around the house, and stop by early afternoon.
Can you paint brick, and can that ever be undone?
Yes to the first, mostly no to the second. Painted brick stops breathing the way bare brick does, and stripping it later is slow and expensive. Plan on repainting every 7 to 10 years once you start.
A remodeling contractor based in Rio Grande City, working across the four Valley counties. The team is led by David Aceves, whose background is building custom homes, from the slab and the framing to the finish work.
Last reviewed: · More about Aceves Home Remodeling
Let us talk07