Before anything gets poured, we drive the ranch road. A loaded flatbed with long frame pieces has to reach the pad and turn around.

A ranch building is a steel barn for equipment, hay or livestock, with open sides, closed sides or a mix of both. We build them in Starr County and across the Valley on caliche and brush ground. The site gets cleared and leveled, and the columns sit on footings or a slab, depending on the use.

What the job includes02

What a barn and ranch building job with us includes

Ranch ground in Starr County is caliche under brush. Caliche is slow to dig and firm once you reach it, which suits a column footing. Mesquite comes off the pad first so the building sits level. Summer sun on equipment parked in the open cracks hoses, seats and tires. A barn roof also has to handle hail and the straight line wind that runs across open pasture with nothing to slow it.

Contemporary gray stucco home with a charcoal shingle hip roof and a new lawn
Contemporary gray stucco homeCuates Construction
  • Ranch road and gates checked for a loaded flatbed before the job is scheduled
  • Brush and mesquite cleared off the pad, then caliche spread and compacted
  • Concrete footings at every column, or a full slab where equipment parks
  • A frame sized for open sides, which catch more wind than a closed building
  • Vertical roof panels so rain and leaves run off instead of sitting on the ribs
  • Gable ends or sides closed on the side the wind and rain come from
  • Wide openings so a tractor, a hay trailer or a stock trailer can back in
Signs you need this work
  • A tractor or a shredder parked under a mesquite and rusting at the joints
  • Hay bales spoiling on the outside after one rainy week
  • Cattle or goats with no shade in the pens on an August afternoon
  • An old wood barn with a sagging roof and posts rotted at the ground line
  • Feed sacks and fence supplies riding in the truck bed because there is nowhere dry
Remodels designed around your houseA background building custom homesEnglish and SpanishBased in McAllen, serving the whole ValleyFree, complete estimate with no surprises

Price range03

How much do barns and ranch buildings cost in the Rio Grande Valley?

How long it takes

2 to 3 weeks for an open 30 by 40 equipment barn on footings

About 10 days for a small livestock shelter. Five weeks or more for an enclosed barn with a slab at the end of a long ranch road.

Which material holds up best in Valley weather?

Materials compared for the Rio Grande Valley climate
MaterialHolds up becauseWatch out forBest for
Open sided barnLowest cost per covered foot, and air moves through for animals and hayRain blows in on a windy day, and nothing inside can be locked upShade for livestock and parking for equipment you use every day
Partly enclosed barnClosed on the windward side and the gable ends, open where you drive inCosts more than open sides and still leaves tools in viewHay that needs cover from rain blowing in sideways
Fully enclosed barnLocks up tractors, tools and feed, and keeps dust and rain outThe highest cost of the three, and it sweats inside without ventilationEquipment and feed that have to stay dry and secure

How we work this job04

How does the job actually run?

A written estimate before anything starts, a start date we commit to, and one person responsible from the first walkthrough to the last inspection.

  1. We drive the road and walk the padAceves Home Remodeling drives the ranch road with you, checks the gates and the turns, and picks a pad where runoff drains away from the barn.Day 1
  2. Clear, fill and compactBrush comes off the pad, caliche goes down in layers and gets compacted, so the footings sit on firm ground.Week 1
  3. Footings or slab, then the frameColumn footings or the slab are poured and cured. The frame goes up with the closed sides facing the weather.Week 1 to 2
  4. Roof, sides and a walk aroundVertical roof panels go on, the closed sides and gable ends are paneled, and we walk the barn with you before we leave the ranch.Week 2 to 3

From the build site05

Which homes has David Aceves helped build?

Homes built by Cuates Construction, with David Aceves on the build. Aceves Home Remodeling plans a metal buildings job with that same eye.

Stone and stucco home with a shingle hip roof, a three-car garage and a stamped concrete driveway
Two-story stone and stucco homeCuates Construction
White board and batten home with a black shingle roof, dormers and a cedar post porch
White board and batten farmhouseCuates Construction
Blue board and batten ranch home with white stone, cedar trim and a gray shingle roof
Blue board and batten ranch homeCuates Construction
The four homes, room by room

Questions we get06

Questions homeowners ask us about this work

Should a ranch barn have open or closed sides?

It depends on what lives under it. Livestock and hay need air, so open sides or one closed wall facing the weather work well. Tractors, tools and feed need a door that locks and walls that keep rain out. Many barns mix both, with an enclosed bay for equipment beside an open bay for shade.

Can the delivery truck reach a barn site down a ranch road?

Usually, but we check first. A flatbed hauling long frame pieces needs a road that holds up after a rain, gates wide enough to pass and room to turn around at the pad. If a stretch of road is soft, we plan around it before the delivery is scheduled.

Does a barn need a full concrete slab?

Not always. Open barns for shade and hay often sit on concrete footings at each column with a caliche floor. Equipment barns do better on a slab, because a tractor on dirt tracks mud and ruts the floor. A slab can also go in later under one bay if the use changes.

How do you build a barn on caliche in Starr County?

Caliche is hard to dig but firm once you reach it, which is good for footings. The pad gets cleared of brush, leveled with compacted caliche and graded so water runs away from the columns. Footing holes go down into firm ground, not just into the loose layer on top.

How tall should an equipment or hay barn be?

Measure the tallest thing going in: a tractor with a cab, a loaded hay trailer or bales stacked with a loader. Most equipment barns need 12 to 14 feet of clear height at the eave. Leave more if a loader will be stacking hay inside.

Written byThe Aceves Home Remodeling team

A remodeling contractor based in McAllen, working across Hidalgo, Starr and Cameron counties. The team is led by David Aceves, whose background is building custom homes, from the slab and the framing to the finish work.

Last reviewed: · More about Aceves Home Remodeling

Let us talk07

Tell us about your metal building project.

(956) 997-9334
Get a Free EstimateSee Our Work
ResponseComplete, line-item estimate with no surprises
LanguagesEnglish and Spanish
Based inMcAllen, TX
HoursBy appointment
Free estimate4 fields

Tell us what needs work

Complete, line-item estimate with no surprises
CallFree Estimate