Stone and stucco home with a shingle hip roof, a three-car garage and a stamped concrete driveway

Fence Installation in San Benito, TX

Water standing along your line rots wood pickets from the ground up. Steel posts do not wick that water, and a rot board at grade takes the wear.

We build fences in San Benito, about 49 minutes from our base in McAllen. Lots near the resacas hold water, so post holes here go deeper and take more concrete. We measure your line on the ground and count gates separately. The written estimate is complete, with no surprises.

Local conditions02

What changes for fencing in San Benito?

  • Fence work in San Benito splits between town lots near Harlingen and bigger lots out toward the fields.
  • On the resaca side the water table is close enough that a post hole can fill while the crew is still digging it.
  • Water sits at the bottom of the line after a heavy rain, so wood pickets rot from the ground up.
  • Outside the city limits the runs get long, and a quarter mile of line changes how the job is staged.
  • Brush and huisache grow into the old line, so clearing comes before the auger.
  • Gates on the rural lots here take a trailer or a tractor, not just people, so they get framed wider and cross braced.
Permits and requirements
  • Fence height rules and front yard rules change by city. We check what San Benito allows at your address before we quote, and we pull what is required.
  • Lots outside the city limits answer to the county, and the requirements there are different. We read your address against both.
  • Resacas, canals and drainage ditches usually carry an easement held by a district. We find out who holds it before we set a line near it.

How is a fence priced in San Benito?

San Benito sits in zone 2, about 49 minutes from the shop in McAllen, so no travel rule applies to your fence. What separates one quote in this town from another is the ground. A hole that fills while it is being dug takes a wider dig, more concrete and more time, so a lot by the resaca and a lot on higher ground never come out the same.

The water that rots a fence picket from the ground up works on anything else built in a San Benito yard, which is why a metal building on a raised pad and pergolas in San Benito start with the ground too.

County
Cameron County
Drive time from McAllen
49 minutes
Zone
2 · Up to an hour away
Languages
English and Spanish

From the build site03

Which homes has David Aceves helped build?

Homes built by Cuates Construction, with David Aceves on the build. Look at the property edges, the ironwork and the concrete at the lot line: Aceves Home Remodeling plans a fencing job with that same eye.

Stucco home with two wood-tone garage doors and a metal privacy fence behind it
Two-story stone and stucco homeCuates Construction
Board and batten siding and a black shingle roof lit at dusk
White board and batten farmhouseCuates Construction
Stone veneer entry tower and brown shingle roof on a custom stucco home
Two-story stone and stucco homeCuates Construction
The four homes, room by room

Questions we get04

What people in San Benito ask us

My last fence rotted out at the bottom where the water stands. What stops that?

Three things, and none of them are the picket. Steel posts set in concrete instead of wood, because steel does not wick water. A rot board at grade that takes the wear and can be swapped later. And a gap under the pickets so the wood is not sitting in mud. Those show as visible lines on the estimate.

My lot outside San Benito runs deep. Does a long fence cost less per foot?

The per foot number usually eases on a long straight run, because the crew sets more posts per day. Corners, gates and turns are what push it back up, and a deep lot has fewer of those per foot. We measure the whole line and write the gates as their own items. You see which part of the fence drives the total.

The ground is still wet from last week. Do we have to wait to set posts?

Sometimes, and we would rather wait than set a post in a hole full of water. A flooded hole waters down the concrete and the post moves later. On soft San Benito lots we pump or bail the hole, widen it and set the post dry. If the whole line is under water, we move your date and tell you the same day.

Let us talk05

We can be in San Benito this week.

(956) 997-9334
Get a Free EstimateSee Our Work
ResponseComplete, line-item estimate with no surprises
LanguagesEnglish and Spanish
Based inMcAllen, TX
HoursBy appointment
Free estimate4 fields

Tell us what needs work

Complete, line-item estimate with no surprises
CallFree Estimate